With cold weather approaching, we’re beginning efforts to winterize our on-site concrete casting facility. We installed two hydronic air heaters to help regulate the curing process of our in-house architectural moldings and panels. We’ll have the walls of the room spray foamed in a few weeks and hopefully by then our final in-slab radiant heating will be installed. It’s amazing what you can do with finished plywood, some ingenuity, and power steering fluid!
Fresh panels with #3 epoxy coated dowels.
Column bodies in the shop.
Day old blocks laid out to dry.